2016: Wi-Fi planning and on-site measurements answer different questions
A forecast study helps to prepare the site; field observations allow for a comparison of the project with the building.
Topic year 2016

Preparing for a settlement
In 2016, the planned Wi-Fi studies were already one of the opportunities being explored to prepare a project. They are used to organize the establishment based on assumptions about premises and their characteristics. Zyxel, interest in a site study.
A cover representation is not a measure made in each room. This difference must remain clear when comparing a technical proposal with the expected result after installation.
Describe the assumptions
The quality of the plan, levels, nature of separations and areas to be covered influence preparatory work. The intended uses and devices must also be specified.
In particular, the manufacturer Zyxel describes the value of a site survey prior to positioning access points in a multi-level building. The choice of methods and tools remains to be adapted to the actual project.
Confronting the project with use
After installation, testing shall be carried out on the selected areas and applications. They allow to identify a deviation and prepare an adjustment with localized observations.
Alltech prepares installation and connections. When a study is requested, the perimeter should specify what falls within a plan forecast, an on-site survey and post-construction monitoring.