Field reports
Work on the network rack and organise the connections
Overview of the bay, connecting gestures and details of connections: the hotel's network seen closely.
The mission
The need
The technical room concentrates cable arrivals and network equipment. The report shows an intervention in this bay, with views that link the technician's gesture to the organization of connections.
Intervention
The mixing panels and switches ensure continuity between the sockets of the building and active equipment. The work in the bay requires to follow these links before connecting or moving a cord.
Use
The mission operates on an existing facility, with its equipment and wiring. The views alternate with an overview of the bay, cord connection and intervention on its arrivals. These gestures enable the link between the building and active equipment to be monitored.
The steps in images



