Field reports
Wire and install door equipment
Cable passage, work on the dormant and lay elements: a detailed intervention around the doors of the residence.
The mission
The need
In a hotel residence, the intervention on a door concerns both its location, cable passages and surrounding equipment. The report follows this work in the circulations of the establishment.
Intervention
The views show preparation on the dormant, installation of components and connections close to the false ceiling. The detailed photographs allow us to understand the place of elements, in addition to the gesture of the technician.
Use
The mission combines workshop preparation and on-site operations. The elements are installed and connected around the door, taking into account its sleeper and available path. The photographs show a step of laying; they allow to see how the components take place in the building.
The steps in images



