2017: Fibre to the hotel does not replace its internal network
Operator access and connection in rooms are two parts of the same project, with responsibilities to be specified.
Topic year 2017

A arrival to prepare
The fibre hotel connection projects studied in 2017 show the importance of organising the steps before opening up the service. The address, connection possibilities and the point where access will be given to the building must be known.
This arrival is not enough to describe how Wi-Fi works in the rooms. Between the operator's equipment and users there are links and equipment to be examined.
Sharing responsibilities
The owner, operator, operator and installer do not necessarily intervene on the same elements. A simple plan of performance limits avoids looking for an interlocutor only after a breakdown.
The bay, cable paths, power supply and access to the premises must be prepared. The intervention dates must take into account the constraints of an institution that continues to host it.
Control the complete course
A useful test does not stop at the operator. It examines the expected service in the affected areas, with planned devices and applications.
Alltech can prepare the building and network part of the project. To begin with, gather the bay location, available plans and uses that require particular continuity. A request for connection should not be confused with an installation already delivered.