Alltech
Building connections

Network cabling: prepare the connections, facilitate use

A network begins with well thought-out connections. Alltech prepares and installs the wiring that connects the spaces, bays and equipment of your building.

Connection and mixing of cables in a bay.
Connection and mixing of cables in a bay.

Start from your situation.

A new camera, moved office or renovation may reveal the limitations of existing wiring. Before planning the passages, you must understand the uses and look at the places: location of the equipment, available sheaths, access to the premises and finishing constraints. This preparation provides a framework for the work and makes it possible to distinguish what can be reused from what needs to be taken up. It also facilitates coordination with companies already present on the site.

Alltech works on connections and their organization in the building. The work includes, depending on the perimeter chosen, cable passages, connections and bay identification. For an operation on an occupied site, the steps are prepared with the people concerned in order to take into account the accessible spaces and the services used. The connection points and their destination must remain understandable for the teams who will then monitor your installation.

Image equipment and interventions.

Passage of network cables in the ceiling.
Passage of network cables in the ceiling.
Bays and network links identified.
Bays and network links identified.
Switch and network connections.
Switch and network connections.
Views before and after reorganizing a bay.
Views before and after reorganizing a bay.
Equipped computer bay.
Equipped computer bay.
Network links spotted in a patch bay.
Network links spotted in a patch bay.

The points that count.

Preparing the Paths

Examine the available passages, distances and necessary arrivals before finalizing the route. On-site identification helps to anticipate installation difficulties.

Organize connections

Connecting sockets, equipment and bays with useful tracking. The destination of each link must be able to be found when changing.

Coordinate the construction site

Specify who passes the cables, who connects the equipment and who configures them. This distribution makes the interventions of the different professions easier to organize.

Intersecting services.

An example of the field

Correct continuity is not enough

In a measurement campaign, continuity passes but the overall qualification still reveals a lack of crosstalk. The report distinguishes the control carried out from the recovery remaining to be carried out.

Read the experience →

From plug to bay: leaving connections that can be followed

A wiring plan must meet today's requirements and remain legible when a station is moved, a Wi-Fi terminal is added or a camera must be maintained. The preparation brings the destination of each link together, its route, its arrival in the bay and the conditions of access. In an occupied building, it also specifies the steps where existing services can be affected.

Three useful documents at different times

Prepare, locate and verify
Document or statementIts role in the project
Locations and pathwaysLocate the sockets, equipment and passages envisaged before the work and finishes.
Identification of linksMatch the points served and their arrivals to find a connection during a modification.
Results of planned controlsRestore the examined links, the type of test performed and the reserves that still require action.

Continuity, qualification and certification: specify the control requested

These words do not describe the same level of verification. A basic connection check alone does not demonstrate the expected transmission performance. The project must therefore specify the type of test and the report to be submitted. The Fluke Networks technical documentation on wiring controls explains these differences. A liaison certification remains separate from company certification.

The case followed by Alltech makes this distinction very concrete: a link passes the continuity check, but the overall result remains in failure with a crosstalk fault. The report retains this point to be taken up and provides a precise basis for the continuation of the intervention. Read the progress of the measurement campaign.

Coordinate the building part and the IT part

Before installation, identify who prepares the passages, who supplies and connects the sockets, who installs the active equipment and who administers it. It is also necessary to check the usable space in the bays and access after finishing. A theoretical location can become difficult to use if we forget the arrivals, connections or maintenance.

Alltech carries out the field work defined in the project. Agedis provides additional equipment and network administration. For a Wi-Fi network, the connections and the location of access points are brought closer to the needs in the spaces to be served.

The connection is also being prepared in the bay.

Brewing and telephone equipment.
Brewing and telephone equipment.Intervention on the connection of a wall bay: follow the connections and maintain access to the equipment.

Before getting started.

Can we use an existing duct?

It depends on its condition, its accessibility and the space available. The path is verified on site before retaining this solution in the project.

Who is in charge of the network after wiring?

The installation of connections and IT administration constitute two areas to be clarified. Alltech works on construction; Agedis can support network configuration and monitoring.

Connecting the right skills.

Agedis · a complementary skill

Complete the building's connections with a coherent organization of active equipment, access and IT uses.

Administration and networks with Agedis →
Let’s talk about this need →
A need, a question, a project

Let's talk about your project.

Describe your situation, the uses concerned and what you wish to change.

Let's trade →

Complementary expertise, the same high standards.