
2019: When the reception display no longer shows the right information
Power supply, source, broadcast and content: a display failure must be described before selecting the intervention.
Alltech Blog
Electricity, Wi-Fi, access and hotel facilities: understand developments and prepare for the right decisions.
Browse technical developments and field issues, year by year.
38 articles

Power supply, source, broadcast and content: a display failure must be described before selecting the intervention.

Stop selling new lines and stop an existing service are two different steps to distinguish.

Locations, accesses and cables must be coordinated prior to crew passage.

Who can enter, by which door and who updates the authorizations? These questions accompany the installation of equipment.

To prepare an emergency power supply, you need to know the necessary equipment and how long it takes to react.

Operator access and connection in rooms are two parts of the same project, with responsibilities to be specified.

The April 5, 2016 transition shows why a screen, its receiver and collective distribution should be examined separately.

A forecast study helps to prepare the site; field observations allow for a comparison of the project with the building.

Identifying the right entry and housing avoids incomplete interventions on scrolling plates.

Surface, walls, uses and connections: the first questions of a project remain more useful than an isolated number of access points.

Programming a screen involves deciding what it shows, when and who updates the information.

The launch of the Wi-Fi ac certification reminds us that network and terminal capabilities need to be examined together.
In Strasbourg and Alsace, our team accompanies you to study, install and maintain the equipment of your building.